One-pipe steam · P0

Steam main vent sizer

Work out how much air is sitting in the main, divide by how fast you want it gone, and match that rate to vents whose capacity has actually been measured. The tapping size is included because it sets a ceiling no amount of venting can beat.

The main

One row per run. Include the vertical main up to the top floor if you want it vented at the same rate.

Conditions

The pressure column the capacity data was measured at. Vents pass more air at higher pressure, so the answer moves with it.

Three minutes is the working default in the source method. Time an open tapping first if you can — no number of vents beats that.

The tapping is a hard ceiling on the manifold. Set to “Not considered” to see the raw vent count.

Air to move

Volume in the main
0.93cu ft
Required venting rate
0.31CFM
Runcu ft / ftLengthcu ft
2"0.023340 ft0.932

Vent recommendation

Capacities read from the 2 oz column.

1 × Gorton #2

1.75 CFM

Gorton #2 only

1 × Gorton #1

0.54 CFM

Gorton #1 only

Capacity chart needed

No published CFM measurement exists for Gorton Big Mouth, so it is left out of the counts above rather than guessed at.

It is a large-capacity main vent and may well be the right answer here — but picking a count requires a rated figure. See the sources below, or ask the manufacturer for a measured CFM at 1, 2, and 3 oz.

Capacity rises with pressure but so does everything else. The source method is explicit that the chart only gives you a starting point: install, fire the boiler, and time steam to the end of the main against an open tapping.

Main vent capacities

CFM at boiler pressure, as published.

Vent1 oz2 oz3 oz
Gorton #10.3300.5400.700
Gorton #21.1001.7502.200
Gorton Big Mouthchart neededchart neededchart needed

Gorton publishes no CFM ratings of its own — only relative comparisons such as “venting capacity equal to that of 4 #1 Gorton Air Eliminators.” Those are quoted in the code but never converted into a flow rate.

Open-pipe capacity

What the tapping itself will pass, wide open.

Tapping1 oz2 oz3 oz
1/8"1.202.002.50
1/2"2.603.404.80
3/4"not measurednot measured9.50
1"not measurednot measured11.00

Blank cells are genuine gaps in the test data: the source notes that “due to the size of the flowmeter and pipe, at least 3 ounces was required to procure a reading.”

Schedule 40 pipe volume

Computed from ASME B36.10M internal diameters.

NominalID (in)Area (sq in)cu ft / ft
1-1/4"1.3801.500.0104
1-1/2"1.6102.040.0141
2"2.0673.360.0233
2-1/2"2.4694.790.0332
3"3.0687.390.0513
3-1/2"3.5489.890.0687
4"4.02612.730.0884
5"5.04720.010.1389
6"6.06528.890.2006
8"7.98150.030.3474

Method and sources

  1. Air volume = Σ (run length × cubic feet per linear foot), from Schedule 40 internal area.
  2. Required rate (CFM) = volume ÷ target minutes.
  3. Vent count = required rate ÷ published capacity at the working boiler pressure, capped by the open-pipe capacity of the tapping.

The source method treats this as a starting point, then verifies by timing: pull the vent, fire the boiler, and time steam to the open pipe. Reinstall vents until you get close to that time.